District | Vlore | |||||||||
Loan No | 8656- ALB | |||||||||
Source of Loan/Financed by: | ||||||||||
Loan Amount by Currency | ||||||||||
Project Title | Project for Integrated Urban and Tourism Development (PIUTD) | |||||||||
Description of the Project |
Budget: 63.8 million Euros Financed by: World Bank Timeline: 2017 – 2022. The project has become effective in April 2017 and shall take 5 years. Geographic coverage:3 regions (Vlora, Berati, Gjirokastra); 4 municipalities (Saranda, Gjirokastra, Berati, Përmeti) and the tourist corridor going through this region. Beneficiaries: 84 thousand inhabitants and about 300 thousand tourists. Objective: Improve urban infrastructure, promote tourism, and strengthen institutional capacities to support tourism and develop the local economy in selected areas in the south of Albania. Component 1. Urban design and improvement of infrastructure Finances the drafting of projects for the implementation of urban projects and for improving the municipality infrastructure in four urban centers: Saranda, Gjirokastra, Berati, and Përmeti. Investments in these selected municipalities shall include the rehabilitation of the following:
Component 2. Improvement of touristic sites Finances investments intended at improving tourist sites to be selected along the touristic corridor in the South Albania. Investments shall include the restoration of objects of cultural heritage and asset, and the improvement of the support infrastructure. This component is also going to finance the preparation of the visibility studies, site management plans, engineering projects, and supervision of construction projects. Component 3. Tourism and product development market This component is going to finance capacity building activities for improving municipality management and tourism-based local economic development. |
|||||||||
Tender object | “Site Management, Interpretive, Visitor Experience Plans, Design and Supervision for Kanina Castle, Borsh Castle and Spile Cave touristic sites. Structural Interventions to increase cliff stability of Borsh Castle | |||||||||
Reference No. | AL-ADF-245792-CS-CQS | |||||||||
CPV Code |
|
|||||||||
Estimated / Ceiling Value ALL without VAT | ||||||||||
Type of Contract | ||||||||||
Procurement Method | ||||||||||
Stage Procedure | Announced Procurement | |||||||||
Tender Announcement Date | 02-12-2021 | |||||||||
Opening Date for Submission of Bids | 02-12-2021 | |||||||||
Closing Date for Submission of Bids | 23-12-2021 | |||||||||
Sector | ||||||||||
No. of Bidders | ||||||||||
Bidders | ||||||||||
Successful Bidder /Supplier / Provider |
|
|||||||||
The winning bid ALL without vat | ||||||||||
Bidder Announcement date | ||||||||||
Contract date | ||||||||||
Contract Value including VAT | ||||||||||
Contract Milestones Due Dates |
The consultant will perform the Design Services within 12.25 months period, and the level of inputs required is 40,5 man/months. The Supervision Services will be performed by the consultant within 13 months period (also, following defect liability period), and the level of inputs required is 25 man/months. |
|||||||||
Appeals | ||||||||||
Cancellation reason | ||||||||||
Notes | The selection method to be applied is Consultant Qualifications (CQ), in accordance with the procedures set out the World Bank’s Guidelines Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers” (January 2011, revised July 2014). | |||||||||