Open Procurement Albania

Kabine elektrike 20kV, fv.

A Red Flag is a fact, event, or set of circumstances, or other information that may indicate a potential legal compliance concern for illegal or unethical business conduct, particularly with regard to corrupt practices and non-compliance with anti-corruption laws.

  • Disqualification of all competitive operators except the winner/ Disqualification of the lowest value bid
  • Disqualification of all competitive operators except the winner/ Disqualification of the lowest value bid

Procuring Authority / Buyer Sh.A Porti Detar Sarande
Procuring Authority / Buyer
Tender object Kabine elektrike 20kV, fv.
Reference No. REF-17720-04-11-2019
Estimated / Ceiling Value ALL without VAT 5 592 831,00
Type of Contract
Procurement Method Request for Proposal
Stage Procedure Signed the Contract
Tender Publication Date 15-04-2019
Last date of Submitted Documents 26-04-2019
Tender Held Date 26-04-2019
No. of Bidders 3
Bidders AA&P
MANE/S
EDICO GROUP
Successful Bidder /Supplier / Provider
  • “Solar Electric shpk”
  • The winning bid ALL without vat 4 811 595,00
    Bidder Announcement date 17-06-2019
    Award and Contract Amount ALL with VAT 5773914
    Contract date 25-06-2019
    Planned Milestones of Contract / Start and End Date
    Renewal Contract Additional Value (ALL with VAT)
    Appeals Nuk ka pasur ankesa.
    Janë skualifikuar ofertuesit e mëposhtëm:

    1. MANE/S:
    Mungojnë, ose nuk janë përputhje me DST-ën(përfshirë Specifikimet Teknike):
    -Ne kriterin e veçantë, g)3, Shtojca 2, Nr.238Prot.dt 16.02.2019, modifikim DST,: Betoniere 300 litra 1 copë; eshte paraqitur Autobetoniera "MERLO" DBM3500, pa asnje dokument nga DRSHTRR; - Autovinxh mbi 30 ton, eshte pa kontroll teknik periodik(nuk jane paraqiture letrat), ne lejen e qarkullimit kontrolli i fundit eshte bere ne vitin 2016.
    - Kabell XLPE 20kV; Kabllot e fuqise TM 20kV: Kablli i testuar eshte me prerje terthore 25mm2, dhe jo 50mm2 sipas "Spefikimeve Teknike"(DST); - Katalogu nuk tregon mallin e kerkuar nga "Spefikime Teknike"(DST), ofron kabllo me seksion nga 16-35mm2.; - autorizimi i prodhuesit per kabllot 20kv eshte i pa perkthyer, test reportet te pa perkthyer;certifikatat te prodhuesit ISO 9001 ose ISO 9002, nuk jane te paraqiture;

    2. EDICO GROUP:
    - Nuk eshte paraqitur ne dorezimin e Mostrës; “Panel TU”, kerkuar ne DST.
    - Mungon pothuaj teresisht dokumentacioni i kerkuar sipas DST.
    -Ka paraqitur vetëm keto dokumente: Shtojca 4, Shtojcen 1, Shtojcen 1/1, Shtojcen 7, Shtojcen 10 dhe ISO 9001.
    Cancellation reason
    Additions
    Transaction / Actual Spending
  • Public Announcement Bulletin
    18.Shtojca 25
    SHTOJCA NDRYSHIME DST KABINA nga Koordinimi
    111. Shtojca 3
    3.Relacion teknik
    DST
    SHTOJCA NDRYSHIME II
    4.Specifikimet Teknike Kabine 20kV Porti detar Sarande .pdf
    2.Kabine elektrike 20kV Planimetri.pdf

    SUPPORTERS

    Here you can have your ADVERTISEMENT

    Contact at [email protected]

    Privacy Policy

    Except when otherwise defined, all data & information offered in Open Procurement Albania is available under the licenses: This material is Open Data