A Red Flag is a fact, event, or set of circumstances, or other information that may indicate a potential legal compliance concern for illegal or unethical business conduct, particularly with regard to corrupt practices and non-compliance with anti-corruption laws.
Disqualification of all competitive operators except the winner/ Disqualification of the lowest value bid
Procuring Authority / Buyer | ECO-ELB sh.a | ||||
Procuring Authority / Buyer | ECO-ELB sh.a | Tender object | Loti 1 Monitorimi i parametrave mjedisore dhe hartimi i raporteve mjedisore (per landfillin) | ||
Reference No. | REF-69122-05-11-2023 | ||||
Estimated / Ceiling Value ALL without VAT | 3 000 000,00 | ||||
Type of Contract | |||||
Procurement Method | Simplified open procedure | ||||
Stage Procedure | Cancelled Procurement | ||||
Tender Publication Date | 12-05-2023 | ||||
Last date of Submitted Documents | 22-05-2023 | ||||
Tender Held Date | 22-05-2023 | ||||
No. of Bidders | 4 | ||||
Bidders |
1. Eko-Studio-Projekt 2. ECCAT Environmental Consulting, Chemical Analysis & Testing 3. TENUIS LABORATORIES 4. BOE Go-Green Studio & ALPHA STUDIO |
||||
Successful Bidder /Supplier / Provider |
|
||||
The winning bid ALL without vat | 2 097 000,00 | ||||
Bidder Announcement date | 17-08-2023 | ||||
Award and Contract Amount ALL with VAT | |||||
Contract date | |||||
Planned Milestones of Contract / Start and End Date | 12 muaj për secilin lot nga data e lidhjes së kontratës. | ||||
Renewal Contract Additional Value (ALL with VAT) | |||||
Appeals |
Jane skualifikuar operatoret ekonomike te meposhtem: 1. ECCAT Environmental Consulting, Chemical Analysis & Testing, per arsye: -Nuk ka paraqitur Lejen e Qarkullimit per mjetin AB 791 KH. -Nuk eshte laboratori i Akredituar sipas ISO/IEC 17025, per realizimin e matjeeve te parametrave te ndryshem te perberesve te mbetjeve urbane si, letra, karton etj. 2. TENUIS LABORATORIES, per arsye: -Nuk ka paraqitur Certifikaten e kontrollit teknik per mjetin AA 236 IT. -Ka paraqitur oferte anomalisht te ulet 3. BOE Go Green Studio, per arsye: -Nuk ka paraqitur dokumenta per te vertetuar pune te ngjashme per 25 perqind te vleres se kontrates te cilen merr persiper sipas kontrates se bashkepunimit. -Nuk ka paraqitur asnje dokument per te plotesuar kriterin 2.3.4. -Nuk ka paraqitur asnje dokument per te plotesuar kriterin 2.3.7. |
||||
Cancellation reason | Bazuar në Ligjin Nr. 162/2020, datë 23.12.2020 "Për Prokurimin Publik", Neni 98, pika 1: d) Kur Komisioni i Prokurimit Publik vendos anulimin sipas parashikimeve në këtë ligj. Komisioni i prokurimit publik me vendimin nr 833/2023 datë 29.08.2023 ka vendosur: anullimin e proçedurës së prokurimit me nr REF-69120-05-11-2023 | ||||
Additions |
Njoftuar anullimi i procedures se prokurimit ne Buletinin Nr. 77 datë 11 Shtator 2023 Më datë 18.08.2023, pranë Komisionit të Prokurimit Publik, është administruar ankesa e operatorit ekonomik“Tenius Laboratories” SHPK dhe objekti i saj lidhet me kundërshtimin e vendimit të Komisionit të Vlerësimit të Ofertave, mbi skualifikimin e ofertës së operatorit ekonomik “Tenius Laboratories” SHPK. Më datë 18.08.2023,Komisioni i Prokurimit Publik, pasi dëgjoi relatorin e çështjes, shqyrtoi parashtrimet me shkrim e pretendimet e ankimuesit, dhe pasi diskutoi çështjen në tërësi vendosi: 1. Të pranojë pjesërisht ankesën e “Tenius Laboratories” SHPK 2. Autoriteti kontraktor të anullojë Procedurën e prokurimit |
||||
Transaction / Actual Spending |
|
||||
Public Announcement Bulletin |
|
Procuring Authority / Buyer | ECO-ELB sh.a | ||||
Procuring Authority / Buyer | ECO-ELB sh.a | Tender object | (Per landfillin) Monitorimi i parametrave mjedisore dhe hartimi i raporteve mjedisore | ||
Reference No. | REF-81681-09-28-2023 | ||||
Estimated / Ceiling Value ALL without VAT | 3 000 000,00 | ||||
Type of Contract | |||||
Procurement Method | Simplified open procedure | ||||
Stage Procedure | Re-Proclaimed and Cancelled | ||||
Tender Publication Date | 29-09-2023 | ||||
Last date of Submitted Documents | 10-10-2023 | ||||
Tender Held Date | 10-10-2023 | ||||
No. of Bidders | 4 | ||||
Bidders |
1. '' ECCAT Environmental Consulting, Chemical Analysis & Testing '' shpk. 2. TENUIS LABORATORIES SHPK 3. GR ALBANIA SHPK 4. QENDRA E MONITORIMIT TE MJEDISIT SHPK. |
||||
Successful Bidder /Supplier / Provider |
|
||||
The winning bid ALL without vat | 1 804 000,00 | ||||
Bidder Announcement date | 30-10-2023 | ||||
Award and Contract Amount ALL with VAT | |||||
Contract date | |||||
Planned Milestones of Contract / Start and End Date | 12 muaj për secilin lot nga data e lidhjes së kontratës. | ||||
Renewal Contract Additional Value (ALL with VAT) | |||||
Appeals | Nuk ka operatore ekonomike te skualifikuar. | ||||
Cancellation reason | Bazuar në Ligjin Nr. 162/2020, datë 23.12.2020 "Për Prokurimin Publik", Neni 98, pika 1: e) Komisioni i Prokurimit Publik vendos anullimin ne perputhje me parashikimet e LPP. | ||||
Additions |
Me date 30.10.2023, eshte shpallur fitues paraprak i kesaj procedure prokurimi operatori ekonomik ECCAT Environmental Consulting, Chemical Analysis & Testing SHPK me oferte fituese 1.804.000 Leke pa TVSH. Më datë 06.11.2023, pranë Komisionit të Prokurimit Publik, është administruar ankesa e operatorit ekonomik “Qendra e Monitorimit të Mjedisit” SHPK dhe objekti i ankesës lidhet me kërkesën për anulimin e procedurës së prokurimit, si dhe me vendimmarrjen e Komisionit të Vlerësimit të Ofertave mbi kualifikimin e ofertave të paraqiturë nga operatorët ekonomikë “ECCAT Environmental Consulting, Chemical Analysis & Testing” SHPK, “Tenuis Laboratories” SHPK dhe “GR Albania” SHPK. Më datë 11.12.2023, Komisioni i Prokurimit Publik, pasi dëgjoi relatorin e çështjes, shqyrtoi parashtrimet me shkrim e pretendimet e ankimuesve, dhe pasi diskutoi çështjen në tërësi vendosi: 1. Të pranojë ankesën e operatorit ekonomik “Qendra e Monitorimit të Mjedisit” SHPK 2. Autoriteti kontraktor të anullojë procedurën dhe me rihapjen të ketë parasysh konstatimet e Komisionit të Prokurimit Publik. Buletini i Anulimit te Procedures: Buletini Nr. 103 datë 26 Dhjetor 2023 |
||||
Transaction / Actual Spending |
|
||||
Public Announcement Bulletin |
|