A Red Flag is a fact, event, or set of circumstances, or other information that may indicate a potential legal compliance concern for illegal or unethical business conduct, particularly with regard to corrupt practices and non-compliance with anti-corruption laws.
Disqualification of all competitive operators except the winner
Procuring Authority / Buyer | HEC LANABREGAS sh.a | ||||||
Procuring Authority / Buyer | Tender object | Rikontruksioni i Seksionit 6kV ne HEC Lanabregas (Faza e dyte) | |||||
Reference No. | REF-77437-08-15-2023 | ||||||
Estimated / Ceiling Value ALL without VAT | 35 866 371,00 | ||||||
Type of Contract | |||||||
Procurement Method | Open Procedure | ||||||
Stage Procedure | Signed the Contract | ||||||
Tender Publication Date | 16-08-2023 | ||||||
Last date of Submitted Documents | 01-09-2023 | ||||||
Tender Held Date | 01-09-2023 | ||||||
No. of Bidders | 3 | ||||||
Bidders |
1. “HTM” shpk 2. BOE “Inply shpk & Muhoplus LTD shpk” 3. “AZ Trading” shpk |
||||||
Successful Bidder /Supplier / Provider |
|
||||||
The winning bid ALL without vat | 34 731 300,00 | ||||||
Bidder Announcement date | 19-09-2023 | ||||||
Award and Contract Amount ALL with VAT | 41677560 | ||||||
Contract date | 24-11-2023 | ||||||
Planned Milestones of Contract / Start and End Date | Duke filluar nga data e fillimit të punimeve me përfundim brenda 3 (tre) muajve. | ||||||
Renewal Contract Additional Value (ALL with VAT) | |||||||
Appeals |
Nuk ka pasur ankesa. Jane skualifikuar operatoret ekonomike te meposhtem: 1. HTM Shpk, per arsye: -Nuk ploteson piken Nr.1.a, pasi nuk ka plotesuar sakte Shtojcen 8 -Nuk ploteson piken 2.3 Kapaciteti teknik 2.3.1, pasi kontrata e paraqitur si pune e ngjashme nuk eshte kontrate punimesh, por kontrate furnizimi mallrash -Nuk ploteson piken 2.3.5, pika 1, pasi ka paraqitur autorizim nga distributori Albaelettrica, i cili eshte i autorizuar vetem per produktet -Nuk ploteson piken 2.3.5, pika 2, pasi skeda teknike e paraqitur per celat tregon mosperputhje me dimensionet e celes se kerkuar 2. AZ Trading shpk, per arsye: --Nuk ka paraqitur sigurim oferte -Nuk ka paraqitur Certifikaten ISO 45001: 2018 -Nuk ka ngarkuar asnje dokument qe tregon pervojen me punet e ngjashme te meparshme -Nuk ka paraqitur Deklarate per Drejtuesin Teknik -Nuk ka deklaruar Drejtues Teknik Ing. Mekanik ne Formularin e Vetedeklarimit -Nuk permbush minimumin prej 10 punonjesish te punesuar prane shoqerise per 3 muajt e fundit, sipas te dhenave te Shtojces Nr. 8 -Sa i perket pikave 2.3.5, 2.3.6, 2.3.7 nuk ka ngarkuar asnje dokument ne lidhje me kriteret e percaktuara. |
||||||
Cancellation reason | |||||||
Additions | Njoftuar lidhja e kontrates ne Buletinin Nr. 98 datë 4 Dhjetor 2023 | ||||||
Transaction / Actual Spending |
|
||||||
Public Announcement Bulletin |
|